AMI es

ENERGY STAR VERSION 7 COMPLIANT INSTALLATION METHODS

standF (ES+) BEST PRACTICES
Complete Installation Document covering proper opening preparation and proper installation achieving successfull, long lasting weather management solutions.

ToolF (ES-I) TOOLS - HARDWARE
- Hand Tools
- Power Tools
- Specialty Window Tools
- Screws, Anchors and Clips

Rem1 (ES-IIIa) WINDOW REMOVAL 1
- Guidelines
- Frame-In or Frame-Out?
- Removing Wood Sash
- Removing Metal Sash

LeadF (ES-IIIc) LEAD-SAFE INSTALL
- Proper Lead Testing and Notice
- Containment and Disposal
- EPA Rules(www.EPA.gov/lead)
- Equipment and Supplies

FlashF (ES-V) PROPER FLASHING
- Vapor Barriers
- Sill Pans
- Drip Caps
- Method A and Method B

SealF (ES-VII) CAULKS AND SEALANTS
- Adhesive
- Expandable
- SPF Foams
- Proper Gunning

FinUniv ENERGY STAR VERSION*7 DATA PKG
- Introduction
- Version Criteria
- Product Availability
- Energy Savings and Cost vs Payback

DHR SINGLE/DOUBLE HUNG BOX FRAME
- Blind Stop
- Pocket Install
- Remove, Prepare, Install
- Wrapping the Opening

CasmntR CASEMENT - AWNING WINDOWS
- Frame-In
- Frame Out
- Tilt-Turn
- Outside-in Installation

BayR BAY, BOW - GARDEN WINDOWS
- Proper Measure
- Determine Overhang
- Sill Support
- Roof Construction

SteelR STEEL WINDOW REPLACE
- Removing Frame from Masonry
- Leaving Old Frame In
- Jumping Frame
- Trim and Sealing Considerations

CircleR INSTALLING CURVES - SHAPES
- Circle Tops
- Picture Windows
- Trapezoids
- Exterior Sealing

MullR COMBINING - MULLING
- Snap Mulls
- H-Mulls
- Structural Mulls
- Combinations

PDInstll ENTRY - PATIO DOOR INSTALL
- Wood Buck
- Nailing Fin
- Brick Mould
- Proper Sill Preparation

PDsm REPLACE WINDOW wDOOR
- Remove Old Window
- Prepare New Header
- Frame for New Door
- Install Door

JumpR JUMP FRAME INSTALL
- Stucco Frontal Flange
- Safe Removal of Old Window
- Proper Drip Cap
- Proper Perimeter Sealing

CavInssm INSULATE SASH POCKETS FRAME
- Cure Drafts in Box Frame Install
- Insulate Sash Pockets
- Insulate Behind Jambs,
- Insulate Sill and Headers

Fastensm FASTENING
- Screws
- Clips
- Simplex Nails
- Best Practices

WaterR WATER MANAGEMENT
- Divert, Drain and Dry
- Reconnecting the 5 Climate Barriers
- Impel Rods
- Barrier and Drainage Installation

EgressR EGRESS - SAFETY
- Proper Size for Escape
- Tempered Glazing Rules
- Storm Safe
- Sill Height

NoiseR SOUND CONTROL
- Asymmetric Glazing
- Decibels and Comfort
- Isolating the Frame
- Double Windows
MeasF (ES+) PROPER MEASUREMENT
- Width First, then Height
- Bow and Crown
- Level and Planar
- Plumb and Square

PartsF (ES-II) WINDOW STYLES AND PARTS
- Window Anatomy
- Window Hardware
- Window Types and Styles
- Window Operating Types

Rem2 (ES-IIIb) WINDOW REMOVAL 2
- Taking the Old Frame Out
- Removing Steel Windows
- Removing Aluminum Windows
- Concrete/Masonry Tearout

DispF (ES-IV) OLD WINDOW DISPOSAL
- Recycle
- Glass Recycle
- Bagging Debris
- Municipal Waste

Shim2 (ES-VI) PROPER SHIMMING
- Tapered Shims
- Stackable Shims
- Inflatable Shims
- Integral Shims and Buttefly Shims

VarF (ES-VIII) APPLICATION VARIATIONS
- Wood Window- Frame In and FrameOut
- Aluminum Window - Frame In and Frame Out
- Steel Window - Frame In and Frame Out
- Install Variations

Tilt R-5 PERFORMANCE INSTALLATION
- Insulating The Gap
- Using Sill Pads to Level Window
- Eliminate Shims that Leak
- ProperUse of Compressed Sealant Tape

SldrR SLIDING WINDOWS
- Box Frame
- Frame-Out or Frame-In
- Fin/Flange/Flush
- With and Without Head Expander

OutInR OUTSIDE-IN INSTALL
- Install Without Head Expander
- Dealing with Exterior Stop
- Sealing Inside and Outside
- Preserving Inside Trim

FrameoutR FRAME-IN v. FRAME-OUT
- How To Choose
- Proper Sealing for Each
- Measuring for Each
- Structural Considerations

NCsm NEW CONSTRUCTION INSTALL
- Remodeling
- Flashing (Method A and Method B)
- Sill Pans
- Vapor Barrier

CoastRepsm COASTAL REPLACEMENT
- Proper Removal
- Wood Surround/Mounting
- Dealing with the Gap
- Rebuild Opening

Alumsm ALUMINUM WINDOW REPLACE
- Pry Out Old Frame
- Leaving Old Frame In
- Interior Sill
- Level Sill

CoastlR COASTAL NEW WINDOW INSTALL
- CMU Opening
- Masonry Wall
- Impact Glazing
- Wind Loads and Codes

KerfCircleR CURVED OPENINGS IN MASONRY
- Kerfed Wood
- Flexible PVC Foam Trim
- Special Shapes
- Trim

Facesealsm FRAME FIN MOUNT & J-CHANNEL
- Proper Flashing
- Proper Overlapping Flashing
- Foam Board Sheathing
- Integral J-Channel Install

BlockR MASONRY/BRICK
- Masonry/Brick Veneer
- Wood Buck Surround
- Fin, Flange, Flush
- Install in Stucco

UtilityR BASEMENT - UTILITY WINDOWS
- Hopper
- Sliding
- Specialty
- Sealing

FoamTapeR SEALANT TAPE INSTALL
- Gap Install
- Behind Flange/Fin
- Retrofit Installation
- Sealing

FinUniv FIN REPLACE W/ BOX FRAME
- Remove Old Finned Window
- ReTrim with Wider Exterior
- Use Box Frame Replacement Window
- Pocket Install to Outside Trim

Tilt TILT/TURN INSTALLATION
- ProperSizing for Proper Fit
- Important Use of Capture Blocks
- Wood and Block Installation
- Tilt/Slide and Fold and Slide Doors
epaaccept

NOTE: WIXSYS Content and Images Copyright 2012-2024. Used under license from AWDI, LLC.
These instructions are for guidance only. Consulting and applying these instructions and practices will contribute to a successful installation, however the final responsibility for the outcome lies with the person(s) doing the actual work. Local codes and conditions will take precedence. Illustrations and Images are for reference only and may not match the Manufacturer's Products.
Refer to Manufacturers information for accurate product representations. For More Information Contact AWDI:info@awdi.com

DwnLd